টেন্ডার কর্নার

শিরোনাম প্রকাশের তারিখ আর্কাইভের তারিখ
Construction of approach embankment close of Boalia khal - 35.00 MBaggia khal - 30.00m Khejurtala khal - 50.00 M Keyaghar Bakkhin khal - 50.00 M Chaturi khal - 45.00 MKumarkhali khal - 50.00 M Shamirpur khal - 25.00 M Daulatpur khal - 25.00 M.Total 0.310 K.M under polder no - 63/1B in connection with Rehabilitation of Coastal Polder No.-62Patenga 63/1AAnowara 63/1BAnowara & Patiya in Chittagong District during the year 2016-2017. 2017-06-11
Repairing work of Bank Protective work on the Right bank of Sangu River from km. 30.550 to km. 31.310 760.00 m. at Cost Guard Station of Raipur Union Upazilla- Anowara under Polder No.-63/1A in connection with Rehabilitation of Coastal Polder No.-62Patenga 63/1AAnowara and 63/1BAnowara & Patiya in Chittagong District during the year 2016-17. 2017-05-24
Re-sectioning and Repairing work of Marginal Dyke from km. 14.535 to km. 16.800 km. 16.830 to km. 18.300 km.18.350 to km.24.100 km. 24.150 to Km.24.735 and km.24.780 to km 26.575 total 11.865 km at anowara & patia upazilla under the project Rehabilitation of Coastal Polder No.-62 Patenga 63/1A Anowara 63/1B Anowara & Patiya in Chittagong District during the year 2016-17 2017-05-10
Construction of a 1-Vent 1.5m x 1.8m drainage regulator at the out fall of Baggia khal at km.16.800 of polder no - 63/1B Upazilla Anowara District Chittagong under the project Rehabilitation of Costal Polder No.-62Patenga 63/1AAnowara & 63/1BAnowara & Patiya in Chittagong District during the year 2016-2017 2017-05-03
Slope Protecton Work of Marginal-Dyke including Repairing and Re-sectioning of embankment from Km 13.213 to Km 13.613 400.00 m and Km 29.350 to Km 29.650 300.00 m.Total 700 m. at Sarenga and out fall of Sapmara khal of Raipur & Juidondi Union under Polder No.63/1A in connection with Rehabilitation of Coastal Polder No.-62 Patenga 63/1AAnowara & 63/1B Anowara & Patiya in Chittagong District during the year 2016-17.(e-GP-30/SPW/P-63/1A/Saranga/2016-17) 2017-04-30
Renovation works of bath room at VIP resthouse Mosque Residence C-1/2 and Re-Construction of boundary wall in front of new school building at Badderhat Colony under the project Maliara Bakkhine Vandargaon FCDI Project 2nd Phase in Chittagong district during the year 2016-2017. 2017-04-27
Repair maintenance & renovation of office Verandha Stair Residence bath C-1/1& C-1/2 colour wash & other maintenace work at Bahdderhat BWDB colony under the project Maliara Bakkhine Vandargaon FCDI project 2nd Phase in Chittagong district during the year 2016-2017 2017-04-27
Construction of 2 vent 1.5mx1.8m drainage regulator at the outfall of Khejurtala khal at km 18.300 in Polder 63/1B in connection with Rehabilitation of Coastal Polder No.-62Patenga 63/1AAnowara and 63/1BAnowara & Patiya in Chittagong District in Upazila- Anowara District- Chittagong during the year 2016-17 2017-04-24
Breach closing & repair of embankment along with temporary slope protection work of Interior-dyke with geo-bag from km 3.005 to km 3.050 = 45m & km 3.516 to km 3.624 = 108m total = (45+108) = 153.00 meter at Kurushkul Ghodar Par, from km 13.600 to km 13.290 = 310.00 meter at Onr Gora & left bank of Sapmara Khal in between km. 15.000 to km. 15.300 length = 90.00 m Total = (153+310+90) = 553.00 Meter at Juidondi Union in Anowara upazila of Chittagong district in Polder No. 63/1A under Non Development Revenue (NDR) Budget during the year 2015-2016 2016-06-09
Breach closing & repair of embankment along with temporary slope protection work of Sea-dyke with geo-bag from km 34.915 to km 34.970 = 55m, km 35.378 to km 35.710 = 332m & km 35.735 to km 35.850 = 115m total length = (55+332+115) = 502.00 meter at Bar-awlia Mazar of Raipur Union in Anowara upazila of Chittagong district in Polder No. 63/1A under Non Development Revenue (NDR) Budget 2016-06-09
Re-sectioning and Repairing work of Marginal Dyke from km. 14.535 to km. 16.800 km. 16.830 to km. 18.300 km.18.350 to km.24.100 km. 24.150 to Km.24.735 and km.24.780 to km 26.575 total 11.865 km at anowara & patia upazilla under the project Rehabilitation of Coastal Polder No.-62 Patenga 63/1A Anowara 63/1B Anowara & Patiya in Chittagong District during the year 2016-17 2017-05-03
Construction of a 1-Vent (1.5m x 1.8m ) drainage regulator at the out fall of Baggia khal at km.16.800 of polder no - 63/1B, Upazilla Anowara District Chittagong under the project "Rehabilitation of Costal Polder No.-62(Patenga), 63/1A(Anowara) & 63/1B(Anowara & Patiya) in Chittagong District " during the year 2016-2017 2017-05-03