ক্রমিক নং

কাজের নাম

প্রকল্পের ধরণ

প্রাক্কলিত মূল্য

চুক্তিমূল্য

কাজ শুরুর তারিখ

কাজ সমাপ্তির তারিখ (কার্যাদেশ অনুযায়ী)

অগ্রগতি

1
Construction of Retired Embankment from km. 5.700 to km. 6.000 = 300.00 M at Fakirhat of Haildhor Union in Upazila- Anowara, Dist: Chittagong in connection with Polder no- 63/1B under Non-Development Revenue Budget (Economic code- 5974) during the year 2015-2016.(e-GP-01/ctg-1/Retired Embkt/2015-16)
NDR     
2
Construction of Retired Embankment with 5 nos Breach closing from between km. 3.000 to km. 4.000 total length = 279.80 M at Protap Babu House of Barokhaine Union in Upazila- Anowara, Dist: Chittagong in connection with Polder no- 63/1B under Non-Development Revenue Budget (Economic code- 5974) during the year 2015-2016.(e-GP-02/ctg-1/Retired Embkt/2015-16)
NDR     
3
Breach closing of Interior dyke from km. 20.800 to km. 20.814 = 14.00 M at Kaligonj of Porikora Union in Upazila- Anowara, Dist: Chittagong in connection with Polder no- 63/1B under Non-Development Revenue Budget (Economic code- 5974) during the year 2015-2016.(e-GP-07/Interior dyke2/2015-16)
NDR     
4
Re-sectioning work of Sea-dyke in between km 34.880 to km 35.980 total = 466.00 meter at Barawlia Mazar with 40 m temporary slope protection with geobag at Raipur Union in Anowara upazila of Chittagong district in Polder No. 63/1A under Non Development Revenue (NDR) Budget during the year 2015-2016.(e-GP-08/Sea-dyke/2015-16)
NDR     
5
Repair of embankment along with temporary slope protection work of Sea-dyke with geo-bag in between km 41.000 to km 41.100 total = 88.00 meter at Batighor at Raipur Union in Anowara upazila of Chittagong district in Polder No. 63/1A under Non Development Revenue (NDR) Budget during the year 2015-2016.(e-GP-09/slope protection/2015-16)
NDR     
6
Breach closing and Re-construction of Interior dyke in between km. 19.300 to km. 19.400 (14+30) = 44 M at Talsara Borowa Para of Porikora Union in Upazila- Anowara, Dist: Chittagong in connection with Polder no- 63/1B under Non-Development Revenue Budget (Economic code- 5974) during the year 2015-2016.(e-GP-12/Interior dyke/2015-16)
NDR     
7
Repair of embankment along with temporary slope protection work of Sea-dyke with geo-bag from km 39.042 to km 39.117 total = 75.00 meter at Galakata at Raipur Union in Anowara upazila of Chittagong district in Polder No. 63/1A under Non Development Revenue (NDR) Budget during the year 2015-2016.(e-GP-10/slope protection2/2015-16)
NDR     
8
Breach closing including resectioning of Embankment on the Left bank of Dalu River in between km 0.000 to km 7.150(total 0.950 km) at Amilaish and Aochia U.P. of Satkania upazilla in Chittagong District in connection with Dalu River Flood Control Project under Non-Development Revenue Budget (Economic code- 5974) during the year 2015-2016.(e-GP-13/breach   closing/2015-16)
NDR     
9
Rehabilitation of Low level canal for CC lining from River Pumping plant to High level Pumping Plant from km.3.150 to km.4.060=910 meter, km.4.060 to km.4.635=575 meter total 1485 meter in connection with Halda Extension Irrigation Sub-project at Upazila: Hathazari, Dist: Chittagong Under NDR Budget (EC-5974) during the year 2015-2016.(e-GP-20/Lining/HEIP/2015-16)
NDR     
10
Rehabilitation of Low level canal for CC lining from River Pumping plant to High level Pumping Plant from km.4.635 to km.5.210=575 meter, km.5.210 to km.6.000=790 meter total 1365 meter in connection with Halda Extension Irrigation Sub-project at Upazila: Hathazari, Dist: Chittagong Under NDR Budget (EC-5974) during the year 2015-2016.(e-GP-21/Lining/HEIP/2015-16)
NDR     
11
Construction of Cross Regulator at Km.3.110 & Km 6.639 (Total 2Nos) of North Supply Canal in Connection with Halda Extention Irrigation  Sub-Project Upazila: Hathazari, Dist: Chittagong, Under Non-Development Revenue Budget(Economic Code No.-5974) during the year 2014-2015. (Package: e-GP-14/ctg-1/CrossRegulator/2014-15)
NDR     
12
Bank Protection work on the right bank of Chandkhali Khal at Keshua village in U.P.: Barama from KM 1.710 to KM 1.960(=250.00m.) & KM 2.000 to KM 2.150(=150.00m.) total= 400.00m. in Upazila-Chandanaish, Dist: Chittagong under the project "River Bank Protection work on the both banks of Sangu & Chandkhali river in Chandanaish and Satkania Upazillas of Chittagong District" during the year 2015-2016.(e-GP-16/RBP/Chandkhali/2015-16)
ADP     
13
Bank Protection work on the right bank of Sangu river at Dwippara in U.P.: Baitali from km. 7.890 to km. 8.250 (=360.00m.) in Upazila-Chandanaish, under the Project "River Bank Protection work on the both banks of Sangu & Chandkhali river in Chandanaish and Satkania Upazilas of Chittagong District" during the year 2015-2016.(e-GP-18/RBP/Dwippara/2015-16)
ADP     
14
Bank Protection work on the right bank of Sangu river at Jafrabad village in U.P.: Bailtali from km.10.250 to km. 10.900 (=650.00m.) in Chandanaish Upazila under the Project "River Bank Protection work on the both banks of Sangu & Chandkhali river in Chandanaish and Satkania Upazilas of Chittagong District" during the year 2015-2016.(e-GP-19/RBP/Jafrabad/2015-16)
ADP